Deliverables


WP1 Coordination and Management

D.1.1 Project Meetings Report
D.1.2 Financial and Administrative Management report.

Download

WP2 Complete characterization of the condensate resulting from drying and shredding the fermentable fraction of municipal solid waste

D.2.1. Physicochemical characteristics of the synthetic feedstock based on municipal wastewater/ FMSW condensate.
D.2.2. The seasonal characterization of the condensate and its effect on the synthetic feedstock.

Download

WP3 Experimental anaerobic digestion of the condensate/ municipal wastewater mixture in a high-rate anaerobic reactor (PABR)

D.3.1 Report on the performance of anaerobic digestion of the condensate/ municipal wastewater mixture in a PABR
D.3.2 A model for the AD process

Download

WP4 Experimental treatment of digester effluent in a sequencing batch reactor

D.4.1 The lab scale Sequencing Batch Reactor (SBR) made of stainless steel equipped with Programmable Logic Computer (PLC) and Human Machine Interface (HMI).
D.4.3 Report on the activated sludge performance of the digester’s effluent using the lab scale SBR under optimal operation conditions.
D.4.4 Model for the SBR process.

Download

WP5 Continuous MFC for treating digester effluent with production of electricity

D.5.1 Report on the performance of a Microbial Fuel Cell in treating digester effluent.
D.5.2 Model of the MFC process.

Download

WP6 Anaerobic co-digestion (AcoD) of waste activated sludge with household fermentable waste condensate

D.6.1 Report on physicochemical characterization of WAS/condensate mixture.
D.6.2 Report on the performance and optimum operational conditions of the CSTR.
D.6.3 Assessment of the alternative scenario.

Download

WP7 Design of an overall management scheme for handling solid waste and municipal wastewater for a medium size city

D.7.1 A report describing the alternative scenaria of an integrated waste management system designed for a city of 100.000.

Download

WP8 Life cycle analysis (LCA) of this management paradigm in comparison with the existing (standard) management scheme

D.8.1 LCA report

D.8.2 LCC report

Download

WP9 Communication and dissemination

D.9.1 Project website
D.9.2 Activities in the field and disseminate the results
D.9.3 Dissemination plan report at the end of the project

Download